Infectious waste, destroyed on site, safely.
We size, supply, install and maintain medical waste incinerators for hospitals and national health programmes, with the shelter, chimney, flue gas treatment and training each site needs.
Built for the waste hospitals actually produce
Each unit is specified for the waste mix of the site, its daily volume and its hours of operation.
Dressings, gloves, swabs and items soiled with blood or body fluids.
Collected in safety boxes and loaded without opening them.
Tissues and placentas, which need higher heat and longer burning.
These follow separate national disposal routes, never the incinerator.
From the waste room to a clean chimney
Two chambers burn the waste and then its gases, so what leaves the chimney is controlled.
Loading
Bags and safety boxes loaded into the primary chamber, door sealed.
Primary burn
Waste reduced to ash at 850 to 1,000 °C.
Secondary burn
Gases held at 1,100 °C or more for at least two seconds.
Gas treatment
Cooling, scrubbing and filtration where the site or the law requires it.
Ash and records
Ash removed for safe burial; temperatures and batches logged.
What a finished site looks like
The incinerator stands under a steel shelter on a concrete slab, with a lockable waste store, an ash pit and a fence. The chimney is set higher than nearby roofs and placed downwind of the wards.
Four habits we train every operator in
Gloves, apron, boots, face shield and mask before handling any waste.
Waste goes in only when both chambers have reached their set temperature.
Bags loaded at the rated rate, never overfilled, door closed at once.
Date, waste weight, temperatures and ash removed, for audits and maintenance.
From a district clinic to a regional hospital
Indicative ranges. The exact unit is selected for each tender from established manufacturers.
| Class | Burn rate | Typical site | Usual options |
|---|---|---|---|
| Compact | 10 – 30 kg/h | Health centres, district clinics, field hospitals | Diesel burners, mobile or skid-mounted |
| Medium | 50 – 100 kg/h | District and regional hospitals | Shelter, chimney, wet scrubber |
| Large | 150 – 500 kg/h | Referral hospitals, central waste-treatment sites | Full flue gas treatment, automatic loading, emissions monitoring |
Fuel: diesel, gas or dual fuel. Refractory lining rated above the operating temperature. Controls with temperature interlocks so waste is only loaded when both chambers are hot.
Estimate the burn rate you need
A first figure from beds and operating hours. We confirm it with a waste survey on site before any offer.
Everything around the incinerator, not only the unit
Survey and sizing
Waste volumes, waste mix, site layout, prevailing wind and distance to wards.
Supply
Incinerator, burners, controls, chimney, flue gas treatment and spare parts.
Civil works
Concrete slab, steel shelter, waste store, ash pit and fencing.
Installation
Erection, connection, commissioning and first-burn tests on site.
Training
Operators and maintenance staff trained on safe loading, firing and records.
After-sales
Preventive maintenance, refractory repair and spare parts for multi-year operation.
The right unit for each tender
AFRIMED is not tied to one manufacturer. For every project we compare established makers against the specification, the budget and the delivery time, and propose the unit that fits.
- Units compared on burn rate, chamber temperatures, residence time and emissions.
- Manufacturer authorisation and certificates supplied with each bid.
- One AFRIMED contact for supply, installation, training and service, whatever the make.
- Service and spare parts for units already installed, including other suppliers' units.
One group, several specialist lines
AFRIMED supplies, installs and maintains medical equipment and hospital systems across Africa. Incinerators is one of its specialist lines.
Planning healthcare waste treatment?
Send us the number of beds, the waste you produce and your site. We reply with a first sizing and the next step.
Figures on this page are indicative. Final design and capacity are confirmed per project.