IV fluids made in the country that uses them.
We plan and deliver turnkey plants for saline, dextrose and Ringer's lactate, sized to the country's real demand, built to GMP and handed over with trained local staff.
The fluids every hospital uses daily
A standard line covers the core essential-medicines list for infusion, in the sizes wards and theatres actually order.
Rehydration, drug dilution, surgery and emergency care.
Energy and fluid replacement, paediatric and maternal care.
Trauma, burns, obstetric haemorrhage and surgery.
Form-fill-seal bags or blow-fill-seal bottles, chosen per market.
From raw water to a released batch
Each stage runs in the clean-room grade its product contact requires, and every batch is tested before it leaves the warehouse.
Water
Purified water and water for injection, monitored online.
Preparation
Weighing and mixing of salts and glucose in stainless tanks.
Filling
Bag forming, filling and sealing in a clean-room zone.
Sterilisation
Terminal sterilisation in validated autoclaves.
Quality control
Laboratory tests and leak checks before batch release.
Packing
Labelling, cartons and a temperature-aware warehouse.
One contractor from the first study to the first batch
Feasibility and sizing
Demand from national consumption and offtake data, product mix, capacity, budget and payback.
Site and building
Layout, clean rooms, HVAC, utilities and warehouse, designed around the line.
Process equipment
Water treatment, preparation, filling line, autoclaves and QC laboratory from established makers.
Installation and validation
Installation, commissioning and IQ / OQ / PQ qualification to GMP.
Training and transfer
Operators, maintenance and QC staff trained on site, with procedures handed over.
After-sales
Spare parts, preventive maintenance and technical support after start-up.
Capacity follows demand, not the other way round
Indicative figures to start a discussion. Final sizing comes from the country's own consumption and offtake data.
| Configuration | Output, bags of 500 ml / year | Shifts | Typical use |
|---|---|---|---|
| Compact line | about 2,000,000 | 2 | Regional supply, first phase |
| Standard line | about 4,000,000 | 2 | National supply, medium population |
| Extended line | about 6,000,000 | 3 | National supply plus regional export |
A third shift raises output by about half with the same building and line, which shortens payback.
Seven steps, each with a clear decision
- Step 1 · DataNeeds and data
Yearly consumption by product and size, current import prices, and the buyer who will take the output.
- Step 2 · StudyFeasibility and budget
Capacity, product mix, building, utilities, budget and payback in one project note.
- Step 3 · StructureFinancing and agreements
Turnkey contract, public-private partnership or private investment, with land, utilities and incentives agreed.
- Step 4 · DesignDesign and contract
Final layout, equipment list, schedule and contract signature.
- Step 5 · BuildConstruction and installation
Building works, clean rooms, utilities and the process line installed.
- Step 6 · ValidateValidation and first batch
Qualification, test batches, and product registration with the national regulator.
- Step 7 · OperateTraining and operation support
Local team trained and supported through the first production year.
Built for ministries, investors and partners
Government turnkey
A ministry or national pharmacy owns the plant; AFRIMED delivers it ready to produce.
Public-private partnership
The State brings land, offtake and incentives; private partners bring capital and operation.
Private investors
Local investors own the plant; AFRIMED designs, builds and trains, then supports operation.
One group, several specialist lines
AFRIMED supplies, installs and maintains medical equipment and hospital systems across Africa. IV Solutions is one of its specialist lines.
Planning local IV fluid production?
Send us your yearly consumption, the products you need and your site. We reply with a first sizing and the next step.
Figures on this page are indicative. Final design and capacity are confirmed per project.